Books about construction contracts tend to be dense and wordy, but what most architects, quantity surveyors, project managers, builders and employers are looking for is an easily navigable, simple guide to using a contract, written in plain language.

The JCT Standard Building Contract 2011 is an uncomplicated book about a complex and commonly used contract. It straightforwardly and concisely sets out exactly what the contract requires in various circumstances, as far as possible without legal jargon and without assuming any particular legal or contractual expertise from the reader. It explains, often from first principles, exactly what is meant by a contract and why certain clauses, such as extension of time clauses or liquidated damages clauses are present and more importantly, what they mean. The book is divided into many chapters, each with many sub-headings, to make it easy to read and to help readers to find relevant explanations quickly. Tables and flowcharts are used to ensure clarity and most chapters include a section dealing with common problems.

  • Covers the recently issued JCT Standard Building Contract 2011
  • Straightforward, concise, and as far as possible free of legal jargon
  • Sets out exactly what the contract requires in various circumstances
  • Includes many tables and flowcharts to ensure clarity

 

Les mer
Books about construction contracts tend to be dense and wordy, but what most architects, quantity surveyors, project managers, builders and employers are looking for is an easily navigable, simple guide to using a contract, written in plain language.
Les mer
Preface xiv

Abbreviations used in the text xvi

Notes before reading xvii

Part I Preliminaries 1

1 Introduction 1

1.1 What is a contract? 1

1.2 Purpose of building contracts 4

1.3 Types of construction contracts 4

1.4 Characteristics of a standard form 7

1.5 Commonly used contracts 9

1.6 Important background to SBC 11

1.7 SBC and variants 11

2 Basic matters 13

2.1 Works 13

2.2 Drawings 13

2.3 Specification 14

2.4 Schedules 15

2.5 Bills of quantities 15

2.6 The Standard Method of Measurement 16

2.7 Privity of contract and the Third Party Act 17

2.8 Third party rights and collateral warranties 18

2.9 Base Date 19

2.10 Common problems 20

3 About the contract documents 23

3.1 What constitutes the contract? 23

3.2 What are articles and recitals? 24

3.3 How to complete the contract form 25

3.4 Priority of documents 29

3.5 Errors, discrepancies and divergences 30

3.6 Custody and copies 34

3.7 Limits to use 35

3.8 Reckoning days 35

3.9 Certificates, notices and other communications 36

3.10 Applicable law 37

3.11 Common problems 37

4 Related matters 40

4.1 The Housing Grants, Construction and Regeneration Act 1996 as amended 40

4.2 Entire contracts 42

4.3 Express and implied terms 43

4.4 Limitation periods 44

4.5 Letters of intent 46

4.6 Quantum meruit 47

4.7 Limited companies 48

4.8 Bonds 49

4.9 Common problems 51

Part Ii Participants 53

5 The architect’s powers and duties 53

5.1 What the architect can do or must do 53

5.2 Specific requirements under the JCT contract 54

5.3 Powers 54

5.4 The architect’s design role under SBC 54

5.5 The architect as agent for the employer 61

5.6 No power to direct contractor 62

5.7 Issue of certificates 63

5.8 The issue of instructions 66

5.9 Instructions in detail 70

5.10 Issue of information 70

5.11 Duties under the contract 73

5.12 General duties 77

5.13 Does the architect have any duty to the contractor? 79

5.14 Common problems 79

6 The contractor’s powers and duties 82

6.1 What the contractor can do or must do 82

6.2 Person-in-charge 82

6.3 Access to the Works and premises 82

6.4 Carrying out the Works 96

6.5 Levels and setting out 98

6.6 Workmanship and materials 98

6.7 Contractor’s master programme and other documents 100

6.8 Statutory obligations 103

6.9 Antiquities 104

6.10 Drawings, details and information 104

6.11 Compliance with architect’s instructions 106

6.12 Suspension of performance 107

6.13 Does the contractor have a duty to warn of design defects? 108

6.14 Common problems 108

7 The employer’s powers and duties 110

7.1 What the employer can or must do 110

7.2 Express and implied powers and duties 110

7.3 General powers 115

7.4 General duties 122

7.5 Common problems 123

8 Consultants 125

8.1 General points 125

8.2 Quantity surveyors 126

8.3 Employer’s representative/project manager 128

8.4 Structural engineers, mechanical engineers and others 129

8.5 Common problems 129

9 The clerk of works 131

9.1 Method of appointment 131

9.2 Duties 131

9.3 Snagging lists 132

9.4 Defacing materials 132

9.5 Common problems 133

10 Sub-contractors and suppliers 134

10.1 General 134

10.2 Assignment 135

10.3 Sub-contracting 136

10.4 Listed sub-contractors 138

10.5 Named specialists 139

10.6 Common problems 140

11 Statutory authorities 143

11.1 Work not forming part of the contract 143

11.2 Statutory authorities in contract 143

11.3 The CDM Regulations 2007 145

11.4 Common problems 147

Part Iii Work in Progress 149

12 Insurance 149

12.1 Why insurance? 149

12.2 Types of insurance in the contract 149

12.3 What is an indemnity? 150

12.4 Injury to persons and property 151

12.5 Things that are the liability of the employer 152

12.6 Insurance terms 153

12.7 Insurance of the Works: alternatives 154

12.8 A new building where the contractor is required to insure 155

12.9 A new building where the employer insures 156

12.10 Alterations or extensions to an existing building 157

12.11 Benefits for sub-contractors 158

12.12 The Joint Fire Code 158

12.13 Terrorism cover 159

12.14 Common problems 159

13 Possession of the site 161

13.1 General 161

13.2 Date of possession 162

13.3 Common problems 163

14 Extension of time 165

14.1 Basics 165

14.2 Extension of time 166

14.3 Grounds 168

14.4 Procedure 177

14.5 Important conditions 186

14.6 Common problems 188

15 Liquidated damages 190

15.1 What are liquidated damages? 190

15.2 Procedure 191

15.3 Common problems 193

16 Financial claims 195

16.1 Loss and expense claims 195

16.2 Procedure 196

16.3 Effect on regular progress 200

16.4 The architect’s opinion 201

16.5 Ascertainment 202

16.6 Reimbursement under other contract provisions 203

16.7 Relevant matters forming the basis of a claim 203

16.8 Certification of direct loss and/or expense 207

16.9 Contractor’s other rights and remedies 208

16.10 Common problems 208

17 Architect’s instructions 210

17.1 Purpose 210

17.2 Scope 210

17.3 Common problems 216

18 Variations 219

18.1 What is a variation? 219

18.2 Does extra work always involve payment? 221

18.3 Valuation 222

18.4 Treatment of approximate quantities, defined and undefined provisional sums 227

18.5 If the conditions for carrying out other work are altered 228

18.6 Valuation of obligations and restrictions 229

18.7 Schedule 2 quotations 229

18.8 Acceleration 231

18.9 Daywork 232

18.10 Valuation of contractor’s designed portion 233

18.11 Common problems 233

19 Payment 235

19.1 The Contract Sum 235

19.2 Valuation 237

19.3 Method and timing 239

19.4 Payment procedure 240

19.5 Retention 243

19.6 Final payment 245

19.7 The effect of certificates 248

19.8 Off-site materials 250

19.9 Fluctuations 251

19.10 Common problems 252

20 Contractor’s design 254

20.1 Contractor’s Designed Portion (CDP) 254

20.2 Documents 254

20.3 The contractor’s obligations 255

20.4 Liability 258

20.5 Variations 259

20.6 Insurance 260

20.7 Common problems 261

Part Iv Closing Stages 263

21 Practical completion 263

21.1 Definition 263

21.2 What the contract says 263

21.3 Consequences 265

21.4 Partial possession and sectional completion 265

21.5 Common problems 267

22 Defects liability 269

22.1 During construction 269

22.2 Rectification period 271

22.3 Definition 271

22.4 Defects, shrinkages or other faults 271

22.5 Frost 272

22.6 Procedure 272

22.7 Common problems 275

23 Termination 276

23.1 General points 276

23.2 Termination by the employer 278

23.3 Grounds: contractor’s defaults 279

23.4 Grounds: insolvency of contractor 282

23.5 Grounds: corruption 283

23.6 Grounds: neutral causes 283

23.7 Grounds: insurance risks and terrorism cover 284

23.8 Consequences of termination for contractor’s default or insolvency 285

23.9 Consequences of termination for neutral causes or insurance risks 288

23.10 Termination by the contractor 288

23.11 Grounds: employer’s defaults 288

23.12 Grounds: insolvency of employer 292

23.13 Grounds: neutral causes 293

23.14 Grounds: insurance risks and terrorism cover 293

23.15 Consequences of termination for employer’s default, neutral causes or insolvency of the employer, etc. 293

23.16 Consequences of termination for insurance risks 294

23.17 Suspension of the Works by the contractor 295

23.18 Common problems 295

Part V Intractable Problems 297

24 Dispute resolution procedures 297

24.1 General 297

24.2 Adjudication 301

24.3 Arbitration 310

24.4 Legal proceedings (litigation) 317

24.5 Mediation 317

24.6 Common problems 317

Notes and references 319

Table of cases 330

Subject index 339

Clause number index to text 346

Les mer
Books about construction contracts tend to be dense and wordy, but what most architects, quantity surveyors, project managers, builders and employers are looking for is an easily navigable, simple guide to using a contract, written in plain language.

The JCT Standard Building Contract 2011 is an uncomplicated book about a complex and commonly used contract. It straightforwardly and concisely sets out exactly what the contract requires in various circumstances, as far as possible without legal jargon and without assuming any particular legal or contractual expertise from the reader. It explains, often from first principles, exactly what is meant by a contract and why certain clauses, such as extension of time clauses or liquidated damages clauses are present and more importantly, what they mean. The book is divided into many chapters, each with many sub-headings, to make it easy to read and to help readers to find relevant explanations quickly. Tables and flowcharts are used to ensure clarity and most chapters include a section dealing with common problems.
Les mer
  Preface Abbreviations Notes before reading PART I: PRELIMINARIES Chapter 1 Introduction 1.1 What is a contract? 1.2 Purpose of building contracts 1.3 Types of building contracts 1.4 Characteristics of a standard form 1.5 Commonly used contracts 1.6 Important background to SBC  1.7 SBC and variants Chapter 2 Basic matters 2.1 Works 2.2 Drawings 2.3 Specification 2.4 Schedules 2.5 Bills of quantities 2.6 The Standard Method of Measurement 2.7 Privity of contract and the Third Party Act 2.8 Third party rights and collateral warranties 2.9 Base Date 2.10 Common problems Chapter 3 About the Contract Documents 3.1 What constitutes the contract? 3.2 What are articles and recitals? 3.3 How to complete the contract form  3.4 Priority of documents 3.5 Errors, discrepancies and divergences  3.6 Custody and copies 3.7 Limits to use 3.8 Reckoning days 3.9 Certificates, notices and other communications 3.10 Applicable law 3.11 Common problems Chapter 4 Related matters 4.1 The Housing Grants, Construction and Regeneration Act 1996 as amended 4.2 Entire contracts 4.3 Express and implied terms 4.4 Limitation periods 4.5 Letters of intent 4.6 Quantum meruit 4.7 Limited companies 4.8 Bonds 4.9 Common problems PART II PARTICIPANTS Chapter 5 The Architect?s Powers and Duties 5.1 What the architect can do or must do 5.2 Specific requirements under the JCT contract 5.3 Powers 5.4 The architect?s design role under SBC 5.5 The architect as agent for the employer 5.6 No power to direct contractor 5.7 Issue of certificates 5.8 The issue of instructions 5.9 Instructions in detail  5.10 Issue of information 5.11 Duties under the contract 5.12 General duties  5.13 Does the architect have any duty to the contractor? 5.14 Common problems Chapter 6 The Contractor?s Powers and Duties 6.1 What the contractor can do or must do  6.2 Person-in-charge  6.3 Access to the Works and premises 6.4 Carrying out the Works  6.5 Levels and setting out 6.6 Workmanship and materials  6.7 Contractor?s master programme and other documents 6.8 Statutory obligations 6.9 Antiquities 6.10 Drawings, details and information  6.11 Compliance with architect?s instructions  6.12 Suspension of performance  6.13 Does the contractor have a duty to warn of design defects? 6.14 Common problems Chapter 7 The Employer's Powers and Duties 7.1 What the employer can or must do 7.2 Express and implied powers and duties  7.3 General powers 7.4 General duties  7.5 Common problems Chapter 8 Consultants  8.1 General points 8.2 Quantity surveyors 8.3 Employer?s representative/project manager 8.4 Structural engineers. mechanical engineers and others 8.5 Common problems   Chapter 9 The Clerk of Works 9.1 Method of appointment  9.2 Duties  9.3 Snagging lists 9.4 Defacing materials 9.5 Common problems Chapter 10 Sub-contractors and Suppliers  10.1 General  10.2 Assignment 10.3 Sub-contracting 10.4 Listed sub-contractors 10.5 Named specialists 10.6 Common problems   Chapter 11 Statutory authorities  11.1 Work not forming part of the contract 11.2 Statutory authorities in contract 11.3 The CDM Regulations 2007 11.4 Common problems PART III WORK IN PROGRESS Chapter 12 Insurance 12.1 Why insurance? 12.2 Types of insurance in the contract 12.3 What is an indemnity? 12.4 Injury to persons and property  12.5 Things which are the liability of the employer 12.6 Insurance terms 12.7 Insurance of the Works: alternatives  12.8 A new building where the contractor is required to insure  12.9 A new building where the employer insures  12.10 Alterations or extensions to an existing building  12.11 Benefits for subcontractors  12.12 The joint fire code 12.13 Terrorism cover 12.14 Common problems Chapter 13 Possession of the site 13.1 General 13.2 Date for possession 13.3 Common problems Chapter 14 Extension of time 14.1 Basics 14.2 Extension of time  14.3 Grounds 14.4 Procedure 14.5 Important conditions 14.6 Common problems Chapter 15 Liquidated damages 15.1 What are liquidated damages?  15.2 Procedure  15.3 Common problems Chapter 16 Financial claims 16.1 Loss and expense claims  16.2 Procedure  16.3 Effect on regular progress 16.4 The architect?s opinion 16.5 Ascertainment 16.6 Reimbursement under other contract provisions 16.7 Relevant matters forming the basis of a claim 16.8 Certification of direct loss and/or expense 16.9 Contractor?s other rights and remedies 16.10 Common problems Chapter 17 Architect?s instructions 17.1 Purpose 17.2 Scope 17.3 Common problems Chapter 18 Variations  18.1 What is a variation? 18.2 Does extra work always involve payment? 18.3 Valuation 18.4 Treatment of approximate quantities, defined and undefined provisional sums 18.5 If the conditions for carrying out other work are altered 18.6 Valuation of obligations and restrictions 18.7 Schedule 2 quotations 18.8 Acceleration 18.9 Daywork 18.10 Valuation of contractor?s designed portion 18.11 Common problems Chapter 19 Payment  19.1 The contract sum 19.2 Valuation  19.3 Method and timing  19.4 Payment procedure 19.5 Retention  19.6 Final payment  19.7 The effect of certificates  19.8 Off-site materials 19.9 Fluctuations  19.10 Common problems Chapter 20 Contractor?s design 20.1 Contractor?s Designed Portion (CDP) 20.2 Documents 20.3 The contractor?s obligations 20.4 Liability 20.5 Variations 20.6 Insurance 20.7 Common problems PART IV CLOSING STAGES Chapter 21 Practical Completion 21.1 Definition  21.2 What the contract says 21.3 Consequences  21.4 Partial possession and sectional completion 21.5 Common problems Chapter 22 Defects Liability 22.1 During construction  22.2 Rectification period 22.3 Definition  22.4 Defects, shrinkages or other faults  22.5 Frost  22.6 Procedure  22.7 Common problems Chapter 23 Termination  23.1 General points 23.2 Termination by the employer  23.3 Grounds: contractor?s defaults  23.4 Grounds: insolvency of contractor  23.5 Grounds: corruption  23.6 Grounds: neutral causes 23.7 Grounds: insurance risks and terrorism cover 23.8 Consequences of termination for contractor?s default or insolvency 23.9 Consequences of termination for neutral causes 23.10 Termination by the contractor  23.11 Grounds: employer?s faults  23.12 Grounds: insolvency of employer  23.13 Grounds: neutral causes 23.14 Grounds: insurance risks and terrorism cover  23.15 Consequences of termination for employer?s default, neutral causes or insolvency of the employer etc 23.16 Consequences of termination for insurance risks 23.17 Suspension of the Works by the contractor 23.18 Common problems PART V INTRACTABLE PROBLEMS Chapter 24 Dispute Resolution Procedures 24.1 General 24.2 Adjudication  24.3 Arbitration  24.4 Legal proceedings (litigation) 24.5 Mediation 24.6 Common problems Table of Cases Index
Les mer

Produktdetaljer

ISBN
9781118819753
Publisert
2014-03-28
Utgiver
John Wiley and Sons Ltd
Vekt
712 gr
Høyde
244 mm
Bredde
170 mm
Dybde
18 mm
Aldersnivå
P, 06
Språk
Product language
Engelsk
Format
Product format
Heftet
Antall sider
368

Forfatter

Biografisk notat

David Chappell BA(Hons Arch), MA(Arch), MA(Law), PhD, RIBA has 50 years of experience in the construction industry. David has worked as an architect in the public and private sectors, as a contracts administrator, as a lecturer in construction law and contracts procedure and as a construction contracts consultant. He was Professor of Architectural Practice and Management Research at The Queen’s University of Belfast and Visiting Professor of Practice Management and Law at the University of Central England in Birmingham. The
author of many books for the construction industry, he is Director of David Chappell Consultancy Limited, is a specialist advisor to the RIBA and RSUA and regularly acts as an adjudicator.